Construction is getting started in earnest… The concrete slabs have been cut and trenches have been dug. The plumbing crew is laying a completely new network of underground lines for wastewater from the facility. In addition to the bathroom, shower, and kitchen plumbing, all lab sinks have been located along with floor sinks and drains.