Another big effort by the electrical crew, who are nearly finished with the rough-in work. They also made progress installing the infrastructure for the low voltage lines, including the fabulous cable trays (see photo). With all the equipment safely located on the roof, the HVAC ducting also is taking shape indoors (see photo). The outside building walls have been cleaned up and the primer coats applied by the painters. Looks much cleaner! The rear building had its walls insulated and the plywood shoring is being nailed to the framing. The dry-walling will start next week!